Notes on the Data | DKA Solar Centre (2024)

These notes and operational updates on data from the DKASC, Alice Springs and Yulara Solar System should be taken into consideration when analysing the data. They represent significant or interesting events that potentially impact the performance of systems installed at these sites. It is not an exhaustive list of every minor or short-term network or minor system outage. However, please contact us regarding any relevant other dataissues.

For equivalent notes and updates on the NT Solar Resource stations, please download the metadata files which are kept up-to-date with relevant changes affecting thedata.

For general announcements and non-technical updates, check out our latest DKA Solar Centrenews.

  • Website now Fully Operational!

    The DKA Solar Centre website and data downloads are now fully operational. Please see below for changes in thewebsite:

    • DKASC, Alice Springs - Nochanges
    • Yulara Solar System - Nochanges
    • NT Solar Resource - Click ‘DATA DOWNLOAD’ to be redirected to our new host for thisdata.

    Due to this recent site update, some users may experience strange behavior on data download. This issue can be resolved by clearing your cache, or opening the site in a private browserwindow.

    If the issue persists, please contact us via info@dkasolarcentre.com.au

    We appreciate your patience and queries around the return of the website. And thank those continually involved to improving the website’suseability.

    Affects all source data for NT Solar Resource

    Share

    Fri, 13 Oct 2023

  • Scheduled Website Maintenance - Update

    Following a scheduled maintenance operation, the DKA Solar Centre website is now fully operational.

    Please note, some large CSV datasets (i.e. downloads sections) may still in the final stages of re-syncing.

    Check again Monday 9th October (5pm) for complete dataset. Urgent requests for complete datasets can be requested via info@dkasolarcentre.com.au.

    Thanks for your patience and understanding during this period.

    Affects all source data for DKASC, Alice Springs, Yulara Solar System

    Share

    Fri, 6 Oct 2023

  • Data Outage

    This site is undergoing some maintenance, therefore majority of data downloads are not working. Data downloads should be refunctioning approximately end of September, 2023. Sorry for any inconveniencecaused.

    Share

    Tue, 18 Jul 2023

  • Inverter replaced

    The original SMA Site 21 Inverter has been replaced with a new Froniusunit.

    Affects the following sources:

    • 21 Evergreen Solar, 4.9kW, poly-Si, Fixed, 2010

    Share

    Fri, 3 Feb 2023

  • Graphing and Data issues

    Graphing and data download services on the DKASC website have been experiencing intermittent outages and issues over recent months. These problems are undergoing investigation and should be resolved in the nearfuture.

    Affects weather data for DKASC, Alice Springs, Yulara Solar System, NT Solar Resource

    Affects all source data for DKASC, Alice Springs, Yulara Solar System

    Share

    Mon, 30 Jan 2023

  • DKASC site outage

    The DKASC is offline from the ~ 08:00 24/01/2023. This is due to a network wide shutdown for the upgrade of 22kV network supply to the site. It is anticipated that the DKASC will return to full operation by28/01/2023.

    UPDATE: Power was fully restored to DKASC on the 30th January 2023 at ~14:00.

    Affects weather data for DKASC, Alice Springs

    Affects all source data for DKASC, Alice Springs

    Share

    Tue, 24 Jan 2023

  • Inverters replaced

    Original SMA inverters that where experiencing intermittent issues (no output) have been replaced with new Froniusunits.

    Affects the following sources:

    • 10 SunPower, 5.8kW, mono-Si, Fixed, 2009, 215W
    • 12 BP Solar, 5.1kW, mono-Si, Fixed, 2008

    Share

    Thu, 15 Dec 2022

  • Intermittent Inverter Issues

    Ongoing intermittent inverter issues with site 10 and 12 causing periotic loss of AC outputs, generally during the middle of the day. Procurement activities for sourcing replacements areongoing.

    Affects the following sources:

    • 10 SunPower, 5.8kW, mono-Si, Fixed, 2009, 215W
    • 12 BP Solar, 5.1kW, mono-Si, Fixed, 2008

    Share

    Wed, 1 Jun 2022

  • Inverters replaced

    Failed inverters on sites 8,32,33 and 34 have been replaced with Fronius Primo 6kW inverters. These systems are now generating normallyagain.

    Affects the following sources:

    • 8 Kaneka, 6.0kW, Amorphous Silicon, Fixed, 2008
    • 32 Canadian Solar, 5.3kW, poly-Si, Fixed, 2016
    • 33 REC, 5.5kW, poly-Si, Fixed, 2012
    • 34 Winaico, 5.3kW, poly-Si, Fixed, 2012

    Share

    Wed, 4 May 2022

  • Site #37 - Fault

    Due to a tripping MCB Site #37 has been operating on 50% capacity since 25-04-2022. The MCB has now been reset and the system returned to 100%capacity.

    Affects the following sources:

    • 37 Tindo, 5.5kW, poly-Si, Fixed, 2016, TBD

    Share

    Tue, 3 May 2022

  • Notes on the Data | DKA Solar Centre (2024)
    Top Articles
    120 Best Hard Work Pays Off Quotes
    100+ Motivational Quotes About Hard Work That’ll Help You Reach Your Goals
    The Machine 2023 Showtimes Near Habersham Hills Cinemas
    # كشف تسربات المياه بجدة: أهمية وفوائد
    Jay Cutler of NFL Biography, Wife, Career Stats, Net Worth & Salary
    Best Zyn Flavors Ranked
    Michigan Lottery Predictions For Today
    Exploring the Northern Michigan Craigslist: Your Gateway to Community and Bargains - Derby Telegraph
    Congdon Heart And Vascular Center
    Does Publix Pharmacy Accept Sunshine Health
    La Qua Brothers Funeral Home
    Urology Match Spreadsheet
    Nyc Peep Show 2022
    2320 Pioneer Rd
    Rimworld Prison Break
    Walking through the Fire: Why nothing stops Jesus’ love for you - Ann Voskamp
    Black Panther Pitbull Puppy For Sale
    Ofw Pinoy Channel Su
    Hdmovie 2
    Logisch werving en selectie B.V. zoekt een Supply Chain & Logistics Engineer in Coevorden | LinkedIn
    Pcc Skilled Nursing Login
    Dragon Ball Devolution 2 Unblocked
    Ret Paladin Phase 2 Bis Wotlk
    3 Hour Radius From Me
    Antique Wedding Favors
    Zions March Labradors
    Busted Barren County Ky
    Ms Eppi Login
    Are Swagg And Nadia Dating? The Streamers Appear More Than Friends - Eliktopia
    Cnb Pittsburg Ks
    Refinery29 Horoscopes
    Tighe Hamilton Hudson Ma Obituary
    Phunextra
    Pipa Mountain Hot Pot渝味晓宇重庆老火锅 Menu
    Proto Ultima Exoplating
    Mercantilism - Econlib
    The Grand Canyon main water line has broken dozens of times. Why is it getting a major fix only now?
    Secondary Math 2 Module 3 Answers
    Rage Of Harrogath Bugged
    How to Watch Age-Restricted YouTube Videos Without Signing In
    Www.craiglist.com San Antonio
    Margie's Money Saver Hey Dudes
    Sprague Brook Park Camping Reservations
    Every film that has won the Oscar for best picture
    Green Press Gazette Obits
    Dr Bizzaro Bubble Tea Menu
    Investeerder Parry bijt bij Vitesse van zich af: 'Mensen willen mij beschadigen'
    Viaggio Apostolico a Singapore: Santa Messa nello Stadio Nazionale presso il “Singapore Sports Hub” (12 settembre 2024)
    Sams Warehouse Jobs
    El Craigslist
    Pay My Sewer Bill Long Island
    Pnp Telegram Group
    Latest Posts
    Article information

    Author: Kareem Mueller DO

    Last Updated:

    Views: 6157

    Rating: 4.6 / 5 (66 voted)

    Reviews: 81% of readers found this page helpful

    Author information

    Name: Kareem Mueller DO

    Birthday: 1997-01-04

    Address: Apt. 156 12935 Runolfsdottir Mission, Greenfort, MN 74384-6749

    Phone: +16704982844747

    Job: Corporate Administration Planner

    Hobby: Mountain biking, Jewelry making, Stone skipping, Lacemaking, Knife making, Scrapbooking, Letterboxing

    Introduction: My name is Kareem Mueller DO, I am a vivacious, super, thoughtful, excited, handsome, beautiful, combative person who loves writing and wants to share my knowledge and understanding with you.